HEATBANK® Pandora Direct Hot Water 250litre 600Dia

£2,224.06 Ex. VAT

Available on back-order, please allow 4 weeks for delivery

SKU: 70CPC600-250-APA-S Category:

Description

No Discharge Pipes

Unlike other water storage systems, the HEATBANK® Pandora thermal store does not need a discharge pipe to the outside. As central heating is pumped directly from the stored water, sharing the same water, there is no need for any discharge pipes. Other forms of district interface systems typically require a discharge from the central heating system, as well as one from the hot water store resulting in two discharges

Smaller Primary Supply Pipework

District interface systems that do not utilise stored water require high flow rates to be delivered from the central boiler plant in order to drive maximum simultaneous hot water loading. To drive 30 litres of hot water to taps will require similar or greater flow rates to be supplied from the boiler plant, and if there are a number of flats drawing water at the same time the load on the boiler plant can be very large. The HEATBANK® Pandora thermal store uses stored heat to drive heavy water loads, and as such will typically only need 5 to 10 litres per minute to be supplied from the boiler. Load on the boiler is spread over time, reducing the peak instantaneous loading substantially.

Control over Volumes of Water Heated

Unlike any other storage system, the HEATBANK® Pandora thermal store allows the tenant to heat up only small quantities of hot water, if that is all that is required, or to heat up a full cylinder of water in preparation for periods of hefty water demand. The system can even be set-up to automatically vary the quantities of hot water stored to match the demands of the tenant. In addition, hot water can be obtained within minutes of a cold start, again unlike any other storage system.

Cooler Pipework

District interface systems that do not utilise stored water require the boiler supply pipes to be kept hot in order to avoid long delays in supplying hot water once a tap is opened. In Summer, this results in constantly hot pipework and is a major cause of overheating cupboards and corridors, especially in well insulated modern developments. As the HEATBANK® Pandora thermal store uses stored heat within each property, hot water is always available instantly, while boiler pipework can be left to stand cold until a system calls to be reheated, and as this is usually timed it is quite common for primary pipework in corridors to stand cold for the majority of the time.

 

Not a Pressurised Unvented System

The stored water in the HEATBANK® Pandora thermal store is kept at atmospheric pressure with a vent to atmosphere, and as such is not bound by the safety regulations that apply to pressurised unvented systems.

No Limescale Build-Up In Store

It is the same water in the store in 10 years as the day it was installed, overcoming the problems of limescale build-up experienced with other types of storage system.

Fully Pre-Fabricated Systems

In order to make installation as simple as possible, the HEATBANK® Pandora thermal store can be supplied with all components and controls factory fitted, wired and tested, reducing installation to little more than connecting to pipework. The fitted control options extend to include full heat metering services, and even radio linked room thermostats, further simplifying installation on site.

Reviews

There are no reviews yet.

Be the first to review “HEATBANK® Pandora Direct Hot Water 250litre 600Dia”

Your email address will not be published. Required fields are marked *

Specifications

MaterialDuplex Stainless Steel LDX 2101
Base Diameter600mm
Overall Diameter660mm
Storage Capacity250litres
Store PressureUn-Pressurised
Heat InputImersion Heaters
DHW OutputPlate heat exchanger assembly, including 40 plate heat exchanger (100kW, 35 litres/minute), store circuit pump with fitted isolating valves, thermostatic mixing valve, 1’’ (22mm) for high flow and high temperatures, and thermostatic pump flow control.
Maximum Mains Pressure6 bar
Electric Back-Up3kW fitted immersion heater with control thermostat and overheat thermostat. Includes dry-fire protection.
Feed & ExpansionIntegral 12 litre vented expansion vessel, air vent with evaporation protection, anti-vacuum valve, filling point, and filling hose. No discharge pipe required from store. No separate feed and expansion tank required.
Chemical Protection2 litres of corrosion inhibitor to be added.
Servicing RequirementsRefreshing of corrosion inhibitor every two years. Visual checks and operation checks as per client requirements (minimum every 5 years).

Schematics

Sorry, no specifications have been set currently.

Thermal Integration Ltd, Windham Road, Chilton Industrial Estate, Sudbury, Suffolk, CO10 2XD Tel 0845 241 1441

Sage Pay